The Lagos State Government has promised that the Abule-Egba Oshodi BRT corridor will be ready for use as from May 2020. The governor who along with his with cabinet team inspected the work done at the axis expressed some level of satisfaction while also assuring residents that the road will be ready for all by May 2020.
In his word, he said, As part of the inspection of ongoing projects, I visited the Abule-Egba-Oshodi BRT corridor today. The project was conceived with the intention to address transportation and congestion challenges. We are back on the project and have told the contractor to speed up the pace of work.
The work on this corridor will significantly bring relief and reduce traffic congestion.
We plan that by the end of May, this phase will be completed. It has reached 75 per cent completion and then work on the Abule-Egba to Sango BRT corridor will start immediately.
You must be logged in to post a comment Login