The ongoing rehabilitation and reconstruction of the Lagos Eko bridge is receiving massive attention as the contractors are trying to finish up within the speculated time.
This is the Costain Section of Eko Bridge on Saturday. The Eko Bridge section was shut months ago for renovation works. The Emergency Repair Work is going on smoothly and it is being supervised by the Federal Ministry of Works, the construction is going on close to Costain bridge.
It will be recalled that early August, Gov Babajide Sanwo-Olu promised and assured that the section of Eko Bridge that is currently closed down would be open to traffic by the end of next month.
He also said the contractor handling the repairs of the Alaka to Costain section of the bridge had promised to complete the works next month.
It will be recalled that in March, the government in the announcement said that the segment of Eko Bridge Inward Apongbon from Alaka through the front of the National Theatre Complex would be closed to all traffic from to allow for a detailed investigation of distressed bearings observed along that segment of the bridge.
These are photos from the ongoing construction from the Costain axis at the weekend.