We may soon be seeing some rapid development and actualization in the 2nd Niger Bridge. Remember we have an archive where we keep track of all former posts and work done at this site.
According to the latest spotted by AutoReportNG, something good seems to be coming so soon for this bridge. The pre-cast and reinforced concrete is at its logical state. Let’s not bore you with too many stories, these are images obtained from the site.
It will be recalled that the Second Niger Bridge is a key national infrastructure, with immense socio-economic benefits for the contiguous states and indeed the entire nation.
Upon completion, the bridge will ease traffic flow, improve road safety, and create greater opportunities for local residents by advancing the commercial viability of the immediate area and regenerating economic life.
The scope of works include the construction of 1.6 km long bridge, 10.3 km Highway, Owerri interchange and a toll station. The project is constructed by Julius Berger Nigeria PLC and it is awarded by Nigeria’s Federal Ministry of Works and Housing.
You must be logged in to post a comment Login