2nd Niger Bridge: Finally, The Bridge Is Coming Up - PHOTOS –
Connect with us

Roads & Construction

2nd Niger Bridge: Finally, The Bridge Is Coming Up – PHOTOS

Published

on

Second-Niger-Bridge
Spread the love

We may soon be seeing some rapid development and actualization in the 2nd Niger Bridge. Remember we have an archive where we keep track of all former posts and work done at this site.

According to the latest spotted by AutoReportNG, something good seems to be coming so soon for this bridge. The pre-cast and reinforced concrete is at its logical state. Let’s not bore you with too many stories, these are images obtained from the site.

It will be recalled that the Second Niger Bridge is a key national infrastructure, with immense socio-economic benefits for the contiguous states and indeed the entire nation.

Upon completion, the bridge will ease traffic flow, improve road safety, and create greater opportunities for local residents by advancing the commercial viability of the immediate area and regenerating economic life.

The scope of works include the construction of 1.6 km long bridge, 10.3 km Highway, Owerri interchange and a toll station. The project is constructed by Julius Berger Nigeria PLC and it is awarded by Nigeria’s Federal Ministry of Works and Housing.


Spread the love

AutoReportNG is your one-stop place for quality news on roads, cars, and anything pertaining to mobility. We keep track of all current news in road, rails, and aviation. We are known to true, factual and investigative news.

Trending

FAQ und Support-Chat helfen euch ebenso weiter wie die einfache Menüführung. casino spielen Auch das Feuer speiender berg (umgangssprachlich) Las vegas Bonus Guthaben unterliegt natürlich solchen Konditionen. https://vulkan-vegas.de Der Bonusbetrag ergibt sich” “mit jeder zeit aus deinem Gesamtwert der Einzahlungen kklk Tages geteilt durch Fünf. vom vulkan So sind sowohl Freispiele als auch kleinere Bonusguthaben für pass away nächste Einzahlung möglich. vulkan vegas