The Lagos state governor and his team inspect the Oshodi Transport Interchange which is 85 percent completed; Bus Depot at Oshodi, Yaba, Oyingbo to be ready by March; International Airport Road to be ready by early May; Oshodi-Abule Egba BRT Corridor to be delivered by April; and vehicle assembling plant at Awoyaya in Ibeju Lekki.
The bus depots are equipped with facilities such as depot office, dormitory, 30,000 liters underground tank, 30, 000 liters overhead tank, automated and elevated car wash, toilets, fuel dump, utility buildings and central workshop housing spare parts and operational offices, as well as equipment for the maintenance of the buses.
The 820 buses, which have already been delivered, are equipped with cameras, USB point, internet, television, and special spaces for physically challenged, pregnant women and the aged, among others.
The Governor, who rode in one of the buses with cabinet members, allayed fears of some residents over ongoing projects, saying that concerted efforts would be made to complete many of them before the expiration of his tenure.
He said the good thing about the continuity in governance which he had been preaching is that the governorship candidate of the All Progressives Congress (APC) in the State, Mr Babajide Sanwo-Olu had signed on to the projects.
“I know that the feedback we are getting is that Lagosians are worried whether some of this our critical projects will be delivered before we leave office.
“We want to assure them that with what we have had from the contractors and the inspection we have done today, these projects will be completed and some of them if they are not completed, Jide Sanwo-Olu will complete them and that is the whole essence of governance of continuity that we are preaching and that is why we believe strongly that he would not only complete them but also escalate them to higher level and that is the whole idea about APC,” Governor Ambode said.
You must be logged in to post a comment Login