See The Ongoing Rehabilitation Work On Marine Beach Bridge, Apapa (VIDEO, Photos) – AutoReportNG
Connect with us

Roads & Construction

See The Ongoing Rehabilitation Work On Marine Beach Bridge, Apapa (VIDEO, Photos)

Published

on

Spread the love

The federal government of Nigeria has released visuals from the ongoing rehabilitation works from the Apapa Marine Beach bridge in Lagos. 

It will be recalled that in July, the Federal Controller of Works in Lagos, Mr Olukayode Popoola revealed that the ongoing replacement of bearings and expansion joints on the Marine Beach Bridge in Apapa would be completed before the scheduled delivery date.

This was disclosed while Popoola supervised the lifting up of the beams of some sections of the bridge. He pointed out that the project, which began in May, had recorded 30% completion so as to deliver it ahead of schedule.

Commenting further on the Apapa Bridge, Popoola said, “They (contractors) are supposed to have changed 36 bearings but as at today, they have changed about 60. So we are ahead of time because they were supposed to achieve that target by the end of August.

“So, by that August, they will be laying asphalt on top of the bridge, so we are ahead of the scheduled time. We are working on the Apapa bound lane now and after completion, we will now change to another lane, we are working section by section.”

He also explained that the repair work on the first section, which is about 200 metres, would be completed by August. After the completion, ongoing repair work will then move to another section, which is expected to be completed in March 2021.

The Controller explained that the bearings and expansion joints were worn out and had become dangerous for use, hence, the need to lift up the bridge to repair the base and some components. Hence, he appealed for the understanding and cooperation of motorists to ensure speedy completion of the project.

AutoReportNG got a video showing how the magnitude of work on the Apapa Marine Beach Bridge and how the workers are working extra hard in making sure they deliver before time.

These are pictures culled from the video.

 


Spread the love

AutoReportNG is your one-stop place for quality news on roads, cars, and anything pertaining to mobility. We keep track of all current news in road, rails, and aviation. We are known to true, factual and investigative news.

Advertisement
Advertisement

Trending

FAQ und Support-Chat helfen euch ebenso weiter wie die einfache Menüführung. casino spielen Auch das Feuer speiender berg (umgangssprachlich) Las vegas Bonus Guthaben unterliegt natürlich solchen Konditionen. https://vulkan-vegas.de Der Bonusbetrag ergibt sich” “mit jeder zeit aus deinem Gesamtwert der Einzahlungen kklk Tages geteilt durch Fünf. vom vulkan So sind sowohl Freispiele als auch kleinere Bonusguthaben für pass away nächste Einzahlung möglich. vulkan vegas