See The Ongoing Road Construction At Lagos-Ota-Abeokuta Expressway (PHOTOS) – AutoReportNG
Connect with us

Roads & Construction

See The Ongoing Road Construction At Lagos-Ota-Abeokuta Expressway (PHOTOS)

Published

on

Spread the love

The Lagos-Ota-Abeokuta road is in the news again. The road which has been in construction since 2017 is one of the busiest road linking Ogun State to Lagos metropolis.

Lagos-Ota-Abeokuta Expressway

The Lagos – Abeokuta Expressway is an 81-kilometre-long (50 mi) expressway connecting Abeokuta, the capital of Ogun State, and Ikeja, the capital of Lagos, Nigeria’s largest city.[1] The Lagos – Abeokuta expressway is Nigeria busiest highway, linking people living in metropolitan and greater Lagos, as well as people from outside the state. This expressway is the busiest inter-state and intra-city route in Nigeria and handles more than 250,000 PCUs daily and constitutes one of the largest road networks in Africa.

In 2017 the Lagos State government decided to develop and construct a BRT lane on the Lagos Abeokuta expressway. The construction and development of the BRT lane is to be in two phases, the phase I is from Oshodi to Abule Egba, while phase II runs from Abule Egba to Ota toll gate which is the boundary between Lagos and Ogun States. “The regulator of the BRT scheme, the Lagos Metropolitan Area Transport Authority (LAMATA), has boasted that traffic on the heavily congested Oshodi-Iyana-Ipaja-Abule-Egba route would reduce by 40 per cent after the completion of the project.” “The passengers estimate on the corridor is about 230,000 per day, but it can go up to 300,000.

Lagos Abeokuta Expressway

The reconstruction of the expressway was flagged off on May 14, 2018, by Mr. Babatunde Fashola ( SAN) Minister of Power, Works and Housing of the Federal Republic of Nigeria, to help reduce the travel time of hundreds of thousands of commuters. The contract was awarded to Julius Berger Nigeria and Reynolds Construction Company Limited at a sum of ₦22,000,000,000.00, equivalent to $61,380,000.00. Two sections of the expressway will be reconstructed and this includes Section I (Lagos to Ota) and section II (Ota to Abeokuta.

Ever since the reconstruction works began, the contractors have been working to ensure the smooth flow of traffic on this route.

These are images from the construction of Lagos-Ota-Abeokuta road.

 


Spread the love

AutoReportNG is your one-stop place for quality news on roads, cars, and anything pertaining to mobility. We keep track of all current news in road, rails, and aviation. We are known to true, factual and investigative news.

Trending

FAQ und Support-Chat helfen euch ebenso weiter wie die einfache Menüführung. casino spielen Auch das Feuer speiender berg (umgangssprachlich) Las vegas Bonus Guthaben unterliegt natürlich solchen Konditionen. https://vulkan-vegas.de Der Bonusbetrag ergibt sich” “mit jeder zeit aus deinem Gesamtwert der Einzahlungen kklk Tages geteilt durch Fünf. vom vulkan So sind sowohl Freispiele als auch kleinere Bonusguthaben für pass away nächste Einzahlung möglich. vulkan vegas